![]() ![]() No water will be turned on unless the Water Superintendent has notification from the Cross Connection Control tester that the device passes the required test.įor approval of new water line installation/upgrade and to have the water turned on:. ![]() No more than fourteen days from the installation of the device, the Owner or agent must schedule an appointment for inspecting the device installation.If the device is installed prior to obtaining the permit, the permit fee will be doubled to $50.The Water Superintendent will issue a permit.The Owner or Agent must deliver design data sheets, a drawing of the plans for installation of the reduced pressure backflow preventer or double check valve assembly, along with a $25 permit fee, to the Water Superintendent prior to the issuance of a building permit and prior to the installation of the device.No plumbing permit shall be issued for cross connection installations requiring Reduced Pressure Zone Backflow Preventers or Double Check Valve Assemblies until the application for such permit is accompanied by a letter of approval from the Department, its Designee or public water system.In conjunction with the requirements of the Department of Environmental Protection 310 CMR 22.22, the following procedures apply: View a fee schedule for each of the City's water and sewer services. The Department also assists with snow removal and emergency responses.ĭial 311 (61 outside Somerville) to report a problem with water or sewer service. The Water and Sewer Department uses state-of-the-art technology and works in a fiscally responsible manner to keep water and sewer service affordable. The Somerville Water Department maintains, repairs and improves the City's 118 miles of water mains, 1,500 fire hydrants and 15,6000 water service connections and meters, ensuring high-quality and dependable service. Thank you for your prompt response and cooperation. Participation In the City of Somerville Meter Replacement program Is MANDATORY. You may also go to to request an appointment time through our website, and MIi will contact you to confirm your appointment. The average installation time is approximately less than one (1) hour. MIi will attempt to arrange an appointment time that is convenient for you. You may also leave a message with their 24-hour answering service. (MIi), our Installation contractor, at 1-80, Monday - Friday, 8:00 a.m. To schedule an appointment for your meter replacement, please contact Mass Installation, Inc. There is no cost to you for any of the needed work. 5850, needs to replace the water meter or meter transmitting unit (MTU) at your home or business and has contracted with Mass Installation, Inc. In our continuing efforts to improve our utility service to you, the City of Somerville, Department of Water and Sewer, (617) 625-6600 ext. ![]() You can also leave a message with their 24-hour answering service. at or by phone at 1-80, Monday - Friday, 8:00 a.m. The subsequent bill will return to being reflective of actual meter readings.įor additional information and answers to some frequently asked questions, please click here. This may result in the bill following the water meter replacement being higher or showing a credit on the account. When a new water meter is installed the actual read is taken from the old one, which may be higher or lower than the estimated reads. The Water and Sewer department is in the midst of a Citywide Water Meter Replacement Project for existing equipment and water meters. The water meters that are being replaced have been accurately reading water usage throughout your estimated read period, but the transponders have not been automatically transmitting the information to our Billing Division. Some ratepayers have been receiving water and sewer bills with estimated reads (denoted by an “E” in the Read Code column), due to equipment no longer transmitting readings from their water meters. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |